13 Towns

Water Supply and Sanitation Improvements for 13 Towns

Client :

13 Towns

Rift Valley Water Services Board (Now Rift Valley Water Works Development Agency)

Period of Assignment:

2007 -2008

Financed By:

ADB and GoK

Staff Months :

60

Project Background:

The Project entailed Study of feasible management options for the 13 Water Schemes (Naivasha, Gilgil, Njoro, Elburgon, Molo, Narok, Mogotio, Eldama Ravine, Maji Mazuri, Kabarnet, Kapenguria and Lodwar) which were formerly operated and managed by the National Water Conservation and Pipeline Corporation (NWCPC) and the Ministry of Water and Irrigation (MWI) and facilitate the transfer of these services to RVWSB and its contracted Water Services Providers (WSPs) in accordance with the Water Act (2002).

It also involved Determination of the Immediate (2006 – 2010) and Medium Term (2020) Investment Needs basically on Rehabilitation and Expansion of Water Supply and Sanitation Services, including Environmental Audit, Unaccounted for Water Study for the 13 Towns. The total area covered was approximately 140 km2.

Preparation of Final Design and Tender Documents for Implementation of Immediate and Medium Term Investment Programme in 5 of the Towns – Naivasha, Gilgil, Njoro, Elburgon and Molo. The total area covered approximately 109 km2. This also involved Rehabilitation and Augmentation of Water Supply and Sanitation Works of 5 Secondary Towns (Naivasha, Gilgil, Molo, Elburgon & Njoro).

< Back

Visit

"The Address” 8th Floor Muthangari Drive/Waiyaki Way, Westlands, Nairobi, Kenya.

Working Hours
 

Monday - Friday: 7:45am to 4:30pm

Saturday & Sunday: Closed

Call
email
address

+254725 321 201,+254 20 2710 500,

+254 20 2710 547

mibp.nairobi@mibp.co.ke
P.O Box 48674 - 00100, Nairobi, Kenya

  • Instagram
  • Facebook
  • X
  • Linkedin
  • Youtube

Copyright © 2024 Mangat I.B Patel (MIBP) Ltd

ISO 9001:2015 CERTIFIED

QMS11016  QMS
bottom of page