Ruiru & Juja Water Supply Works

Ruiru & Juja Water Supply Works

Project Details

Client:

Athi Water Services Board (Now Athi Water Works Development Agency)

Period of Assignment:

2010 - 2012

Financed by:

World Bank and GoK

County/ Town

Kiambu

Services

Design Review and Construction Supervision of the Works.

Project Backround

The Ruiru and Juja Water Supply Project was implemented by Athi Water Works Development Agency (AWWDA) with financing from the World Bank. The Project covered the Towns of Ruiru and Juja in Kiambu County. Ruiru Town is located along the Nairobi-Thika Highway, about 30km from Nairobi City. Juja Town is also located along the same Highway, 40km from Nairobi City.

The Scope of Works under the Project was:

1) Ruiru Works (13,000m3/day)
• Intake Works on Ruiru River and Raw Water Pumping Station
• Raw Water Pumping Main, DN 400 Steel Pipe, length 1.0km
• Treatment Works, capacity 13,000m3/d
• Treated Water Gravity Main, DN 500 Steel Pipe, length 9.4km

2) Juja Works (4,000m3/day)
• Intake Works on Ndarugu River
• Treatment Works, capacity 4,000m3/d
• Raw and Treated Water Pumping Station