top of page

Environmental Studies


With the growing concern and need for Environmentally Sustainable Projects, MIBP has amassed considerable expertise in conducting Environmental Impact Assessments, Studies of Land Use, Terrestrial Ecology, Limnology, Ornithology, Environmental Monitoring Plans, social impacts and mitigating proposals for Infrastructural Projects. These studies have been conducted in accordance to Governments and major Donor Agency Guidelines, Safeguards and Policies.

  • Lake Nakuru Biodiversity Conservation Project (2018)

MIBP has also carried out several other Environmental Studies including the following key Projects;

  • Mbagathi Dam

  • Moiben Dam

  • Itare Dam

  • Mwache Dam

  • Eldoret Sanitation Project

  • Nyeri Water Supply Project

  • Trade Effluents Studies for Industries (Leather, Breweries, etc)

Road Infrastructure


Over the past 50 years, the Firm has carried out Planning, Design and Construction Supervision of over 500 km of roads varying from gravel standard rural access roads to heavily trafficked tarmac highways following the latest pavements designs. MIBP has also dealt with Management of Road Maintenance Organizations, establishment of Management Systems, assistance in procurement of appropriate plants and materials.

  • Infrastructural Works at EPZ, Athi RIver
     

  • Best Alternative Route Linking Lakeside Northern Tanzania to Narok Town (2010)
     

  • Geotechnical Investigation - Proposed Link Road from Narok to Isebania

bottom of page